# Why YamBMS, if my BMS already talks to my inverter?
|
||||
|
||||
Most YamBMS installations run on BMS models that can be wired straight to an inverter — JK
|
||||
accounts for about 72% of them, and RS485 for about 65% of the links. These users could skip
|
||||
YamBMS entirely. They don't.
|
||||
|
||||
The reason is that a working link is not the same as a good one. Your BMS firmware is closed and
|
||||
its logic is fixed. Your inverter's firmware is closed and has its own quirks. YamBMS sits
|
||||
between the two and is the only layer in that chain you can actually configure, observe and fix.
|
||||
|
||||
## Does any of this sound familiar?
|
||||
|
||||
**"My SoC drifts further off every week, ever since I stopped charging to 100%."**
|
||||
A BMS estimates SoC by counting coulombs through its own internal shunt, and recalibrates when
|
||||
the pack reaches full charge. If you deliberately stop short of full — which is exactly what you
|
||||
should do to limit calendar ageing — that recalibration never happens and the error accumulates.
|
||||
This is not a firmware bug that a future update will fix; it is the limit of the method.
|
||||
|
||||
It matters more than a wrong gauge reading, because many inverters make their decisions from
|
||||
SoC. A drifting SoC produces an inverter that cuts discharge too early, force-charges for no
|
||||
reason, or switches to grid at the wrong moment. You end up troubleshooting the inverter when
|
||||
the real problem is upstream.
|
||||
|
||||
YamBMS lets you combine an external shunt and use **its** SoC as the reference sent to the
|
||||
inverter — measured on the real system current, independent of what each BMS believes about its
|
||||
own pack. This is the problem the project was originally built to solve.
|
||||
|
||||
**"My inverter charges at a higher voltage than the BMS asked for."**
|
||||
Some inverters hold their output slightly above the requested CVL — around 0.1 to 0.3 V. A BMS
|
||||
wired directly has no way to react: it sends its setpoint and lives with the result. `Auto CVL`
|
||||
is a PI controller that measures the actual result and trims the request until the pack sits
|
||||
where it should.
|
||||
|
||||
**"My inverter discharges the battery when it switches from Bulk to Float."**
|
||||
A sudden drop in requested voltage can make an inverter pull the pack back down to the new
|
||||
target instead of simply stopping. `Auto Float` ramps the voltage down gradually instead of
|
||||
stepping it, so the transition stays smooth.
|
||||
|
||||
**"My battery sits at 100% all day and I worry about its lifespan."**
|
||||
`Auto SoC Limit` lets you charge to a target SoC instead of to full, switching to `Float`,
|
||||
limiting the charge current, or both once the limit is reached.
|
||||
|
||||
**"One cell hits OVP at the end of charge while the others are still well below."**
|
||||
Cells with different internal resistance diverge under current — the weakest one runs ahead and
|
||||
trips the alarm. `Auto CCL Current Taper` reduces the charge current along a knee-to-bulk curve
|
||||
so the pack reaches bulk cleanly, then holds a low balance current so there is a real balancing
|
||||
window instead of a race to zero.
|
||||
|
||||
**"I added a third BLE pack and the connections keep dropping."**
|
||||
An ESP32 saturates after a small number of simultaneous BLE links. YamBMS's server/client
|
||||
architecture turns each BLE, UART or RS485 BMS into a Modbus RS485 node, so the number of packs
|
||||
is no longer limited by the BLE stack. Every server node still publishes its full telemetry to
|
||||
Home Assistant on its own; only the values needed for aggregation travel on the bus.
|
||||
|
||||
## Where it also helps
|
||||
|
||||
- **Inverters that follow a protocol loosely.** SRNE units and their rebranded variants are a
|
||||
recurring case with PYLON RS485. YamBMS speaks several inverter protocols and is fixed on the
|
||||
YamBMS side when an inverter misbehaves — you don't have to wait for a firmware release.
|
||||
- **Mixed batteries.** Different BMS brands or models that cannot talk to each other are
|
||||
combined into a single view and a single link to the inverter.
|
||||
- **Non-communicating BMS.** YamBMS supplies the communication layer that isn't there.
|
||||
- **Active balancers.** Supervised in the same device rather than left as a silent box in the
|
||||
corner.
|
||||
- **Visibility.** Everything lands in Home Assistant — per-pack entities, a ready-made dashboard,
|
||||
and an optional LVGL display.
|
||||
|
||||
## When you don't need it
|
||||
|
||||
If your BMS drives your inverter correctly, your SoC is accurate, and the default behaviour
|
||||
suits you, you don't need YamBMS. It earns its place when the fixed logic on either side stops
|
||||
matching what you want from your system.
|
||||
|
||||
*Around 256 installations are running today.*
|
||||