@@ -52,11 +52,28 @@ The `Float voltage` slider allows you to set the voltage used after charging is
|
||||
|
||||
The `Inverter Offset V.` slider allows you to correct the inverter charge voltage, either because it does not respect the requested value or because your inverter is far from your batteries and there is a voltage drop. This allows you to reach the target `Bulk` or `Float` charge voltage by adding an offset.
|
||||
|
||||
### Max current (%)
|
||||
### Max Requested Current
|
||||
|
||||

|
||||

|
||||
|
||||
The allowed charge or discharge current is automatically calculated based on the `OCP` values of your BMS. The `OCP` currents of the combined BMS (not in alarm) are added together and the requested current is a percentage `0~90%` of this value.
|
||||
|
||||
The required `charge/discharge current` is calculated as follows :
|
||||
|
||||
1. You define a **maximum current** that can never be exceeded
|
||||
2. YamBMS calculates the **maximum current** accepted by your BMS (total of OCP values * 0.9)
|
||||
3. The temperature-based current limiting function calculates the **maximum current** `based` on the **temperature**, the **battery capacity** and the **charging_rate_table** / **discharging_rate_table**
|
||||
|
||||
The **current requested** by YamBMS will be **the lowest** of these three values.
|
||||
|
||||
## Requested Values
|
||||
|
||||

|
||||
|
||||
These 4 sensors allow you to see what is being requested of your inverter.
|
||||
|
||||
In the example below, we are in the `Float` phase at a voltage of `53.6V` and an `Inverter Offset V.` of `0.1V`. The `Requested Charge Voltage` is therefore `53.7V`.
|
||||
|
||||
The `Requested Discharge Voltage` is the `UVP + 0.2` value of your BMS multiplied by the number of cells, in this example (3V * 16).
|
||||
|
||||
### ReBulk
|
||||
|
||||
@@ -177,18 +194,6 @@ At about 18:08 the battery is 100% after a short balancing period.
|
||||
|
||||

|
||||
|
||||
## Requested Values
|
||||
|
||||

|
||||
|
||||
These 4 sensors allow you to see what is being requested of your inverter.
|
||||
|
||||
In the example below, we are in the `Float` phase at a voltage of `53.6V` and an `Inverter Offset V.` of `0.1V`. The `Requested Charge Voltage` is therefore `53.7V`.
|
||||
|
||||
The `Requested Discharge Voltage` is the `UVP + 0.2` value of your BMS multiplied by the number of cells, in this example (3V * 16).
|
||||
|
||||
The `Requested Charge/Discharge Current` is the `OCP` value of your BMS multiplied by the `Max current` percentage, in this example (150A * 80%).
|
||||
|
||||
## Inverter Heartbeat Monitoring
|
||||
|
||||

|
||||
|
||||
Binary file not shown.
|